Swiss Prime Site developed the tower on the former Maag gear-factory site next to Bahnhof Hardbrücke. It opened fully let in December 2011 and is still the tallest building in Zürich.
- Official height
- 126 m
- Tallest building in Switzerland 2011–2015; still the tallest in Zürich
- Floors above ground
- 36
- Clouds restaurant on 35, conference centre on 34
- Basement levels
- 2
- Two-level underground garage
- Gross floor area
- 53,461 m²
- 73,830 m² incl. Cubus and Diagonal annexes
- Rentable area
- ≈ 40,000 m²
- 1,275 m² per storey, up to 4 tenants per floor
- Workplaces
- ≈ 2,000
- 60–100 per floor; 3,500 across the whole Maag ensemble
- Site area
- 9,800 m²
- Former Maag gear factory site
- Building volume
- ≈ 228,000 m³
- Losinger quoted 280,000 m³ construction volume
- Investment
- CHF 355–380 M
- Tower + Platform + Cubus + Diagonal
- Elevators
- 9
- 6.5 m/s · top floor in about 30 s
- Facade
- ≈ 20,500 m²
- ≈ 4,400 frameless, green-tinted triple-glazed elements
- Concrete
- 36,000 m³
- 6,000 t reinforcing steel · 5-day cycle per floor
- Certifications
- LEED Gold
- Core & Shell (70 pts) · Minergie · greenproperty
- Owner
- Swiss Prime Site
- Developer and owner since 2004 (Maag Holding takeover)
- Contractors
- Losinger + Steiner
- ARGE Prime Tower; Platform by HRS
- Award
- Gute Bauten 2011–15
- Auszeichnung für gute Bauten der Stadt Zürich