Zürich-West · Hardstrasse 201

Prime
Tower

Floor plate

Hover or tap a floor to see who is there. Toggle Tenants to colour the whole stack.

Model built from the 3. OG letting plan, Gigon/Guyer plans and sections and OSM footprints. Stylised, not a survey.

At a glance

Switzerland's tallest building, 2011 to 2015

Swiss Prime Site developed the tower on the former Maag gear-factory site next to Bahnhof Hardbrücke. It opened fully let in December 2011 and is still the tallest building in Zürich.

Height
126 m
132.6 m to tip · highest occupied floor 118.7 m
Floors
36 + 2
36 above ground, 2 basement levels
Architects
Gigon/Guyer
Annette Gigon & Mike Guyer, Zürich
Completed
2011
Inaugurated 6 Dec 2011, fully let
Official height
126 m
Tallest building in Switzerland 2011–2015; still the tallest in Zürich
Floors above ground
36
Clouds restaurant on 35, conference centre on 34
Basement levels
2
Two-level underground garage
Gross floor area
53,461 m²
73,830 m² incl. Cubus and Diagonal annexes
Rentable area
≈ 40,000 m²
1,275 m² per storey, up to 4 tenants per floor
Workplaces
≈ 2,000
60–100 per floor; 3,500 across the whole Maag ensemble
Site area
9,800 m²
Former Maag gear factory site
Building volume
≈ 228,000 m³
Losinger quoted 280,000 m³ construction volume
Investment
CHF 355–380 M
Tower + Platform + Cubus + Diagonal
Elevators
9
6.5 m/s · top floor in about 30 s
Facade
≈ 20,500 m²
≈ 4,400 frameless, green-tinted triple-glazed elements
Concrete
36,000 m³
6,000 t reinforcing steel · 5-day cycle per floor
Certifications
LEED Gold
Core & Shell (70 pts) · Minergie · greenproperty
Owner
Swiss Prime Site
Developer and owner since 2004 (Maag Holding takeover)
Contractors
Losinger + Steiner
ARGE Prime Tower; Platform by HRS
Award
Gute Bauten 2011–15
Auszeichnung für gute Bauten der Stadt Zürich

Gigon/Guyer

Two rectangles, melted into a crystal

The architects won the invited competition in 2004 with a green-glass volume whose contours change with every viewpoint.

Two rectangles, melted together

The plan is an irregular octagon derived from two diagonally connected rectangles. Additional volumes are joined at varying heights, producing setbacks and cantilevers that make the silhouette change with every viewpoint.

It broadens toward the top

Against convention the tower does not taper. Overhanging elements make it wider at the top than at the base; the cantilevers are carried by slanting columns spanning two or three storeys.

Concrete skeleton, three cores

Flat in-situ concrete slabs on high-performance precast columns, with three central core segments running parallel to the facade. A load-distributing base slab on bored piles sits in the Limmat gravel.

Green glass, pixelated

Insulated triple glazing with a greenish tint, frameless on the outside. Every second or third window opens parallel to the facade, leaving 6 cm slits that give the skin its pixelated texture. The colour shifts from emerald to white as you move around it.

Serpentine lobby

The entrance hall is lined with green Aosta serpentine stone rising about ten metres, with interiors developed with Studio Hannes Wettstein.

Low-energy services

Groundwater heat pumps, waste-heat recovery, heat and ice storage, thermo-active ceiling panels and natural ventilation through openable windows. LEED Gold, Minergie and greenproperty certified.

Timeline

  1. 1913

    Max Maag moves Maag-Zahnräder to Hardstrasse 219; the gear works grow to 2,500 employees by 1980.

  2. 1997

    Maag sells its manufacturing; the firm becomes a real-estate company on the former factory site.

  3. 2004

    Swiss Prime Site acquires the Maag group (CHF 0.9 bn). Gigon/Guyer win the invited competition for the tower.

  4. 2006

    A 126 m height profile (Baugespann) is erected with crane and helicopter for three months.

  5. 2008

    18 Feb: demolition of the industrial buildings begins. 19 Nov: foundation stone laid.

  6. 2010

    6 Apr: 105.5 m, overtaking Messeturm Basel. 21 May: core topped out at 126 m. 7 Jul: topping-out ceremony, 68 % pre-let.

  7. 2011

    Summer: first tenants move in. 6 Dec: official inauguration, fully let. 12 Dec: Clouds opens on the 35th floor.

  8. 2012

    2 Jan: the conference centre on the 34th floor opens.

  9. 2015

    Roche Tower Bau 1 in Basel (178 m) takes the national height record; Prime Tower remains Zürich's tallest.

Drawings

Floor plans and sections

Gigon/Guyer publish the full plan set, and the letting agent's PDFs carry a metre scale bar. The drawings are copyrighted, so they are linked here rather than copied. The 3D model's footprint, height steps and cores were measured from them.

What the plans show

Eight facade vertices, two of them reflex: 23.9 m north-east, 26.6 m east toward the Hardbrücke, 24.2 m south-west onto the plaza and 22.7 m west toward the Diagonal, joined by short sides of 12.8 to 21.3 m. Perimeter columns sit about 5.65 m apart, one metre inside the glass, and three off-centre cores run along the diagonal band so both ends of every floor are column-free. Floor-to-floor is 3.35 m with 2.77 m clear; the ground floor is double height.

Who is inside

Law, banking, tech and a restaurant in the clouds

The tower was fully let at opening with about 26 tenants. Floor assignments come from press reports and company pages, so treat them as approximate. Toggle Tenants in the 3D model to see the stack.

Prime Tower

CompanyIndustryStatus
Homburger AG

Anchor tenant since December 2011

Law firmcurrent
Deutsche Bank (Schweiz) AG

Reduced from 5 floors in 2021

Banking & wealth managementcurrent
Citibank (Switzerland) AGBankingcurrent
GAM Investments

Registered seat Hardstrasse 201

Asset managementcurrent
Crypto Finance AG

105 workplaces, moved in 2022

Digital assets (Deutsche Börse Group)current
Zalando Switzerland AG

Floor 23 later marketed for lease; footprint uncertain

E-commerce tech hubcurrent
HDI Global SEIndustrial insurancecurrent
Oracle Software (Schweiz) GmbH

Opened April 2018

IT · Smart Innovation Centercurrent
Roland Berger AG

Since January 2021

Management consultingcurrent
Repower AGEnergy tradingcurrent
Korn FerryExecutive searchcurrent
JLL (Jones Lang LaSalle) AGReal-estate advisorycurrent
Cognizant Technology Solutions AG

Swiss headquarters

IT servicescurrent
Nexxiot AG

Headquarters

IoT & logistics techcurrent
Swiss Prime Site Immobilien AGReal estate (owner)current
FlexOffice (Schweiz) AGServiced officescurrent
Humanis AGRecruitmentcurrent
schilling partners agExecutive searchcurrent
Universal Music Group (Switzerland)

Listed by primetower.ch; not independently verified

Musiccurrent
Clouds

Opened 12 Dec 2011, run by Candrian

Restaurant · bar · conferencecurrent
Hotel Rivington & SonsBarcurrent
Zürcher Kantonalbank

Asset-management floors vacated in 2020

Bankingcurrent
MigrolinoConvenience retailcurrent
Infosys

Opening tenant 2011; moved to The Circle in January 2026

IT servicesformer
Transammonia / Trammo AG

Opening tenant 2011; presence today unclear

Commodity tradingformer
Swiss & Global Asset Management

Opening tenant 2011, later merged into GAM

Asset managementformer

Cubus

CompanyIndustryStatus
Coop ProntoConvenience retailcurrent
kids & co Prime TowerChildcarecurrent
Kieser TrainingFitnesscurrent
Dr. Semm AGMedical practicecurrent

Diagonal

CompanyIndustryStatus
Galerie Eva PresenhuberArt gallerycurrent
Galerie Peter KilchmannArt gallerycurrent
Moyo / Ooki pop-upRestaurant & eventscurrent

Platform

CompanyIndustryStatus
EY (Ernst & Young AG)Audit & consultingcurrent
CoopSupermarketcurrent
EY Restaurant platform (ZFV)Public staff restaurantcurrent

Below the plaza

Two basement levels, one shared garage

The underground garage links the tower with Cubus, Diagonal and Platform. It is private, with monthly spaces rather than public hourly parking.

Levels
2
Tower spaces
182
Site total
≈ 250
Platform
82
Entrance
Zahnradstrasse
Clearance
2.05 m
Monthly rent
CHF 250
Public parking
Pfingstweid, 150 m
  • Two basement levels beneath the tower form the underground garage. Swiss Prime Site quoted 182 spaces for the tower in 2010; the CTBUH database lists 140.
  • Across the whole Maag ensemble, primetower.ch quotes roughly 250 spaces, including 82 under the Platform building.
  • The garage primarily serves tenants. Bahnhof Hardbrücke (S-Bahn) is directly adjacent, and tram and bus stops sit at the foot of the tower.
  • The ramp drops from the eastern end of Zahnradstrasse between the tower and the Cubus. Bollards close the plaza to through traffic. The nearest public car park is Parkhaus Pfingstweid with 276 spaces, open around the clock.
  • Bikes: free racks around Maagplatz and Zahnradstrasse, plus two-tier racks at Bahnhof Hardbrücke on the bridge level.

Maag-Areal

The tower and its three companions

Gigon/Guyer designed the ensemble as a family: the tower, the new Cubus, the refurbished Diagonal and the Platform built for EY.

Cubus

Hardstrasse 221/223

7 floors · 25 m · ≈ 5,300 m²

Gigon/Guyer new build with a white-cement exposed-concrete facade. Small offices, archives, a training centre, a crèche, a gym and a Coop Pronto.

Diagonal

Zahnradstrasse 21 / Maagplatz 3

5 floors · 21 m · ≈ 2,100 m²

Listed industrial building, remediated and refurbished. Home to the galleries Eva Presenhuber and Peter Kilchmann plus restaurant and pop-up space.

Platform

Maagplatz 1

7 floors · 25 m · ≈ 20,900 m²

Built by HRS to EY's specification with about 1,000 workplaces, a public staff restaurant, a Coop supermarket and 82 parking spaces.

47.38586°N 8.51689°E · © OpenStreetMap contributors

Sources

Where the numbers come from

This is an independent showcase and is not affiliated with Swiss Prime Site, Wincasa or Gigon/Guyer. The 3D model is a stylised reconstruction: footprint and height steps follow the published plans, but details are approximate. Map data © OpenStreetMap contributors.